Skip to content
EVs and Backup Power

How an EV Charger Is Installed

Key takeaways

  • Check the panel and service first
  • The breaker is sized at 125 percent of the charger
  • A Level 2 charger adds many more miles per hour than a wall outlet
  • Permits and inspections are usually required

A home charger is one of the simpler big electrical jobs, and it follows a clear order.

Panel check

We calculate your load to see if the panel has room and capacity. If not, an upgrade or a load-management device may be needed.

Circuit size

A charge is a continuous load, so the breaker is 125 percent of the charger’s amps. A 40 amp charger gets a 50 amp breaker.

Wire and mount

Wire is run to the charger location, often in conduit in a garage, and the charger is mounted where the cable reaches.

Permit and test

Most places require a permit and an inspection, and the charger is tested with your car.

Related services

Questions about your own project? Call or text 800-224-9245, or use the estimate form below.

Visit

Let's get your power working right.

Tell us what is happening or what you want added. We read every message and reply with clear next steps and a time for your visit.

  • Your property: where it is, how old the wiring is and what you want done
  • Your city, the job you have in mind, and any result you saved from a tool on this site
  • A visit where we look at your panel and wiring, test what we can and begin a plan around what you want
Prefer to talk? Call or text800-224-9245

Your estimate request

Prefer to type? Text your request. We only use your details to respond to your request.